상세 보기
Benefit–Cost Analysis of Building Information Modeling (BIM) in a Railway Site
- Shin, Min Ho;
- Lee, Hey Kyung;
- Kim, Hwan Yong
WEB OF SCIENCE
31SCOPUS
46초록
Recent technological improvements have made substantial changes in construction industry. In specific, some technical applications, such as Building Information Modeling (BIM), open up many possibilities. Some studies have articulated the use of BIM and its advantages in construction, but most of them are theoretical, not practical. This study is to provide an insight to obstacles in BIM research. By investigating a real project that could utilize BIM in planning and construction phases, the authors try to investigate a possible outline of advantages in BIM implementation. The study area was set to a railway construction site in South Korea. The site covers multiple railway tracks, stations, telecommunication facilities, infrastructure facilities, railway structures, and so on. In the site, the authors have identified 12 errors in 7 projects that could be prevented if BIM was utilized before the construction. The total upfront costs required to provide a BIM for the seven projects was 166,486. This can be regarded as the benefit of using BIM, because if BIM was implemented then the associated errors could easily be replaced. Therefore, the benefit–cost ratio can be estimated as 1.32 for one-month delay and 1.36 for a three-month delay.
키워드
- 제목
- Benefit–Cost Analysis of Building Information Modeling (BIM) in a Railway Site
- 저자
- Shin, Min Ho; Lee, Hey Kyung; Kim, Hwan Yong
- 발행일
- 2018-11
- 저널명
- Sustainability
- 권
- 10
- 호
- 11
- 페이지
- 1 ~ 10
- 언어
- ENG
- 출판사
- MDPI Open Access Publishing
- 발행국가
- 스위스
- 분량
- 10 페이지
- ISSN
- E 2071-1050
P 2071-1050