시공책임형 CM 발주방식 공공부문 시범사업 사례를 통한 리스크 도출

Major Risk Factors to Implement CM at Risk Pilot Project on the Public Sector

초록

The buildings are getting enormous and more complex as well as the requirement of the owner which wants diverse and efficient. Moreover advanced management is necessary for construction services and a new method of delivering project is now required. In order to expand the delivering method and the construction industry, we have to introduced the CM at Risk method. However, despite the fact that six years have passed already the CM at Risk regulation was introduced, the contract amount in significantly lower than that of the CM for fee, and also there is no CM at Risk project in the public sector. As a result, three pilot projects are currently underway for the LH(Korea Land & Housing Corporation) in order to set up a CM at Risk for the public sector. However, detailed regulations related to CM at Risk have not yet been implemented in Korea. Therefore, in this study, I am trying to understand the risks that could incur when practitioners participate in the three pilot projects that are currently underway and employed in the public sector wherein the CM at Risk is normally introduced. Based on the results of this study, It will be able to utilize as a basic data for future CM at Risk delivery system improvement and enactment.

키워드

CM at RiskRisk FactorPublic SectorPilot Project시공책임형 CM리스크공공부문시범사업
제목
시공책임형 CM 발주방식 공공부문 시범사업 사례를 통한 리스크 도출
제목 (타언어)
Major Risk Factors to Implement CM at Risk Pilot Project on the Public Sector
저자
한종훈김경태안용한
DOI
10.6106/KJCEM.2018.19.3.061
발행일
2018-05
저널명
한국건설관리학회 논문집
19
3
페이지
61 ~ 69