책임형 CM 발주방식의 최대공사비보증계약 사례연구 - 미국 공공발주 프로젝트 사례 중심 -

CM at Risk Case Study on Guaranteed Maximum Price Contract - Focused on Cases for USA -
  • 정진학
  • 한종훈
  • 이주성
  • 안용한

초록

The purpose of this study is to derive basic data of the Guaranteed Maximum Price(GMP) process and to present specimens that can be used at the time of execution of CM at Risk project in South Korea. CM at Risk project is issued in South Korea, but the actual data is lack. On the other hand, CM at Risk project is universalized and the market of the CM at Risk is steadily growing. Because of that, in this study, The United States cases was selected as a sample. GMP consists of CM’s fee, CM contingency, project direct cost, project indirect cost, allowance. GMP negotiations are performed before the end of design completion, and after 3 rounds of estimation comparison, preliminary GMP is confirmed. GMP can be multiple contract and it is useful for Procurement of long lead materials and early construction. If the actual cost is lower than expected GMP, sharing of the saving is an option since the conflict of interests between the client and the contractor can occur.

키워드

CM at RiskGMPCM FeeCM ContingencyAllowanceSaving Share책임형 CM최대공사비보증계약CM 수수료CM 예비비미확정 예비비절감액 공유
제목
책임형 CM 발주방식의 최대공사비보증계약 사례연구 - 미국 공공발주 프로젝트 사례 중심 -
제목 (타언어)
CM at Risk Case Study on Guaranteed Maximum Price Contract - Focused on Cases for USA -
저자
정진학한종훈이주성안용한
DOI
10.6106/KJCEM.2019.20.3.022
발행일
2019-05
저널명
한국건설관리학회 논문집
20
3
페이지
22 ~ 30