철도인프라 BIM 적용에 따른 비용편익 효과 분석 - 오송 철도종합시험선로 사례를 중심으로 -

Benefit-Cost Analysis of BIM Application - Case Study on Osong Test Line Railway -

초록

Recent technological improvements have made abundant changes in construction industry. In specific, some technical applications, such as Building Information Modeling (BIM) opens up many possibilities. Some studies have articulated the use of BIM and its advantages in construction, but most of them are theoretical, not practical. This study is to provide an insight to such obstacles in BIM research. By investigating a real project that could utilize BIM in planning and construction phases, the authors try to investigate a possible outline of advantages in BIM implementation. The study area was set to a railway construction site in South Korea. The site covers a multiple railway tracks, stations, telecommunication facilities, infrastructure facilities, railway structures, and so numerous. In the site, the authors have identified 12 errors in 7 projects that could be prevented if BIM was utilized before the construction.

키워드

BIM활용비용편익분석공기단축철도인프라리스크 비용BIM ApplicationCost-Benefit AnalysisConstruction Shortening PeriodRailway InfrastructureRisk Cost
제목
철도인프라 BIM 적용에 따른 비용편익 효과 분석 - 오송 철도종합시험선로 사례를 중심으로 -
제목 (타언어)
Benefit-Cost Analysis of BIM Application - Case Study on Osong Test Line Railway -
저자
김환용신민호한상천최영우김창호
DOI
10.13161/kibim.2018.8.4.041
발행일
2018-12
저널명
KIBIM Magazine
8
4
페이지
41 ~ 48