상세 보기
자료 필터
자료유형
발행연도
2005 ~ 2026
2005 2026
키워드
언어
전체 202건 중 51번부터 60번까지의 결과를 표시합니다.
2018
Article
Multi-period disassembly levelling and lot-sizing for multiple product types with parts commonality
- Kim, Dong-Hyun ;
- Doh, Hyoung-Ho ;
- Lee, Dong-Ho
- 2018-04
- Proceedings of the Institution of Mechanical Engineers, Part B: Journal of Engineering Manufacture
- SAGE PUBLICATIONS LTD
Article
A sample average approximation algorithm for selective disassembly sequencing with abnormal disassembly operations and random operation times
- Kim, Hyung-Won ;
- Lee, Dong-Ho
- 2018-04
- The International Journal of Advanced Manufacturing Technology
- SPRINGER LONDON LTD
Article
Mathematical Model and Solution Algorithms for Capacitated Dynamic Lot-Sizing in Remanufacturing Systems
- Cho, Young-Hye ;
- Doh, Hyoung-Ho ;
- Lee, Dong-Ho
- 2018-03
- Industrial Engineering & Management Systems
- KOREAN INST INDUSTRIAL ENGINEERS
Article
Solution algorithms to minimise the total family tardiness for job shop scheduling with job families
- Yu, Jae-Min ;
- Lee, Dong-Ho
- 2018-00
- European Journal of Industrial Engineering
- INDERSCIENCE ENTERPRISES LTD
2017
Article
An optimal algorithm for selective disassembly sequencing with sequence-dependent set-ups in parallel disassembly environment
- Kim, Hyung-Won ;
- Lee, Dong-Ho
- 2017-12
- International Journal of Production Research
- TAYLOR & FRANCIS LTD
Article
Iterated greedy algorithms to minimize the total family flow time for job-shop scheduling with job families and sequence-dependent set-ups
- Kim, Ji-Su ;
- Park, Jung-Hyeon ;
- Lee, Dong-Ho
- 2017-10
- Engineering Optimization
- TAYLOR & FRANCIS LTD
Article
Priority scheduling to minimize the total tardiness for remanufacturing systems with flow-shop-type reprocessing lines
- Kim, Jong-Min ;
- Zhou, Yi-Dong ;
- Lee, Dong-Ho
- 2017-08
- The International Journal of Advanced Manufacturing Technology
- SPRINGER LONDON LTD